Our Experience

  • Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
    RAK GAS
    United Arab Emirates UAE
    2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013
  • Risk Based Inspection (RBI) Study at AAPD & KRSN Plants.
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    2013
  • Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
    Rak Gas
    United Arab Emirates UAE
    2013
  • Structural Integrity Assessment and Life Extension Study for WHP-E Wellhead Platform for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013
  • Conduct Risk Based Inspection (RBI) Assessment at Shedgum Gas Plant (ShGPD – FGS/PS/FS)
    Saudi Aramco
    Saudi Arabia
    2013
  • Structural Integrity Assessment and Life Extension Study for WHP-C Wellhead Platform for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc.
    Newfield Peninsula
    Malaysia
    2012
  • BUNDUQ – Pipeline Integrity Assessment and Life Extension for 2nos Pipeline
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Small Bore Piping Integrity Program
    Egyptian ELNG
    Egypt
    2012
  • Pilot Risk Based Inspection (RBI) Study for Wellhead Structure for Salamander Energy (Bualuang) Limited.
    Salamander Energy
    Thiland
    2012
  • Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
    Salamander Energy
    Thailand
    2012
  • FFS and Life Extension Services for Pressure Vessels
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Pilot Risk based Inspection (RBI) Study for Wellhead Structurefor Salmander Energy
    Salmander Energy
    Thailand
    2012
  • Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
    Egyptian LNG.
    Egypt
    2012
  • Structural Integrity & Life Extension Study for WHP-B
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc. (Upstream Oil & Gas)
    Newfield
    Malaysia
    2012
  • Risk-Based Inspection (RBI) Assessment of DHT Complex – Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • BUNDUQ – Structural Integrity & Life Extension Study for WHP-C
    Bunduq Company Ltd
    United Arab Emirates UAE
    2012