Our Experience

  • Change Order Authorization(COA -2) Implementation of Maintenance & Integrity Audit Gap Bridging Measures
    ADOC
    UAE
    2020
  • Provision of third party design verification to check suitability of end cap material SA-234 instead of existing SA-105.
    Bilfinger Deutsche Babcock Emirates LLC
    UAE
    2020
  • Environmental Monitoring & Testing
    Burckhardt Compression (Middle East) FZE
    UAE
    2020
  • Environmental Monitoring & Testing for factory in Mussafah
    SAEED AL ZAABI TYRE FACTORY
    Abu Dhabi, UAE
    2020
  • Retrospective Hazop and SIL Study
    Borouge
    UAE
    2020
  • Environmental Monitoring & Testing of Dubai Facility
    EMERSON AUTOMATION SOLUTIONS.
    UAE
    2020
  • VAIL-S20-506 (Velosi Oman- PROVISION OF THIRD PARTY DESIGN REVIEW)
    Velosi Oman
    Oman
    2020
  • Implementation of Maintenance & Integrity Audit Gap Bridging Measures
    Abu Dhabi Oil Co., Ltd (Japan)
    United Arab Emirates UAE
    2020
  • Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for NEB Contract No. 16079.05
    ADCO
    United Arab Emirates UAE
    2020
  • Consultancy Services for Flood Assessment Study (Desktop Study)
    SEVEN TIDES INTERNATIONAL
    Dubai, UAE
    2020
  • Construction Environmental Management Plan for Development of Asharej Roundabout in AlAin
    AL FAHJAN TRANSPORTATION & GENERAL CONTRACTING
    Abu Dhabi, UAE
    2020
  • The Provision of Asset Integrity Specialist Engineering Support Services
    APO. S.A
    Tunisia
    2020
  • Call Out No. 2 CALL-OFF ORDER FOR DESIGNING PRESENT A TIO NS FOR TECHNICAL CONTENTS OF OE DEVELOPED DOCUMENTS UNDER CONSULTANCY AND PROFESSIONAL SERVICES AGREEMENT FOR ASSET INTEGRITY CONSULTANCY STUDIES & TECHNICAL SUPPORT SERVICES ON CALL-OUT BASIS
    ADNOC
    UAE
    2020
  • Inspection and Corrosion Management System Audit
    Borouge
    UAE
    2020
  • Annual Maintenance Updates & Support Services for VAIL Plant Software PSVMS & EIRMS Modules for three years
    Dragon Oil
    UAE
    2020
  • Construction Environmental Management Plan (CEMP) for Well Drilling & Testing Operation in Onshore Block-1
    URJA BHARAT
    UAE
    2020
  • Provision of 3rd Party Approval of Detailed Design Package & Pre-Commissioning Package of NG/SNG Installation Pipe Work
    ALTORATH INTERNATIONAL ENGINEERING CONSULTANTS LLC
    Abu Dhabi, UAE
    2020
  • Project No: MPP080 Constructability Review for ADNOC Sour Gas
    Target Engineering Construction Company L.L.C.
    Abu Dhabi, UAE
    2020
  • Construction Environmental Management Plan (CEMP) for C-080 Internal Roads and Infrastructure for 44 Plots at Al Wathba and Al Khatim (Package 1)
    MACE
    UAE
    2020
  • Environmental Monitoring & Testing for ICAD 1
    Maico Gulf L.L.C
    UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP) and Quarterly Audit for Supply of Recycled water along Abu Dhabi Al Ain Road-Construction
    Larsen & Toubro Limited
    India
    2020