Our Experience

  • Project No: DS/LPO/378 Third Party Review And Approval of Fan Fixing Stability Check Calculation
    Dutch & Spanish General Contracting LLC
    Abu Dhabi, UAE
    2016
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Amonia 1 & 2 Equipment and Structure
    Qatar Fertilizer Company (QAFCO)
    Qatar
    2016
  • As-Built P&IDs and RBI Assessment of Piping System
    Glaxo Smith Kline (GSK)
    Pakistan
    2016
  • To perform piping stress analysis of chiller piping in order to evaluate piping loads used in design calculations of pipe supports by Vendor and review & certification of pipe supports design calculations for chiller piping provided by the Vendor
    Omega Engineering WLL
    Qatar
    2016
  • Construction/Extension of sustainability master plan for DHQ Hospital & Shaheed Saif-ur-Rehman Hospital Gilgit
    Government of Gilgit Baltistan Maintenance Division PWD Gilgit
    Pakistan
    2016
  • Project No: 000/757-2017 Certification of Structural Calculation for Aluminium Woven Screen Types.
    Alba Tower Aluminum
    United Arab Emirates UAE
    2016
  • Order No. 3620287135 PL324 Fitness for Services (FFS) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • LTC/ ENG/2030/12 -CALL-OFF Contract For The Supply Of Sub-Sea Representative To Oversee The Underwater Inspection Surveys Of All Platforms And Do Condition Monitoring Survey For Offshore Pipelines, Cables And Associated Sub Connection Facilities
    QATARGAS OPERATING COMPANY LIMITED
    Qatar
    2016
  • Piping stress analysis of 20″ carbon steel piping for Dhafir Technologies Abu Dahbi
    Dhafir Technologies
    Abu Dhabi
    2016
  • Project No: ABE-13791 Endorsement of Sign Board Structure and its Foundation
    Albanna Engineering LLC.
    Dubai, UAE
    2016
  • SIL Study for All Operating Units at QP Refinery , Mesa
    Qatar Petroleum
    Qatar
    2015
  • Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)
    ADOC Abu Dhabi Oil Co. Ltd. (Japan)
    United Arab Emirates UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings. “
    HEBERGER ENGINEERING
    Abu Dhabi, UAE
    2015
  • Project No: 12423 Design Review and Approval of Lifting Frame & Lifting Beam (01. No)
    Velath Engineering International FZC
    United Arab Emirates UAE
    2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    2015
  • Fire and Gas Equipment Audit Of Mol Production Facilities
    MOL Pakistan Oil & Gas Co. B.V.
    Pakistan
    2015
  • Consultancy Services for Updating Operating Manual for Abu Dhabi Refinery
    TAKREER
    United Arab Emirates UAE
    2015
  • HAZOP Study
    Cylingas Company LLC
    United Arab Emirates UAE
    2015
  • Provision of Third Party Approval of Conceptual Design Package of NG/SNG Installation Pipe work
    Arabian UniGaz
    Abu Dhabi, UAE
    2015
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER
    Abu Dhabi, UAE
    2015
  • Project No: AS-M139-P39484A Third Party services for Structural Integrity Study of Lifting Arrangements
    Dhafir Technologies
    Abu Dhabi, UAE
    2015